Sawaed 108
29 Sept 2025

Sawaed Real Estate Al Hamra 108 Project

2%OverallFirst visit — no previous comparison.

Main video

Engineering Report

The Sawaed 108 project site was visited on September 29, 2025, where it was observed that the site is still in the preliminary preparation stage. The land is entirely vacant, and no construction or excavation work has commenced to date, with only minor surface debris present from previous leveling operations.
Detected changes
General Site100%

The project site is entirely vacant and surrounded by existing buildings on three sides, with some surface construction debris and irregular soil accumulation present.

Excavation and Foundation Works100%

There are no signs of excavation work, shoring, or heavy machinery currently on-site.

Site Preparation90%

The site is not enclosed by a complete temporary construction fence and appears as an open plot between existing residential buildings.

Progress reading

The aerial photographs align with the declared completion rate (0%), as the site remains in a 'vacant land' state and the first phase of the structural framework has not yet begun.

vs previous visit

No previous visit for comparison

Expected next milestones

Site fencing, commencement of excavation works, and delivery of foundation equipment.

Progress

0%OverallAverage item progress
0/5 complete
Excavation Worksnew
0%
Concrete Worksnew
0%
Finishing Worksnew
0%
Electrical Worksnew
0%
Plumbing Worksnew
0%